We develop expert reports using the best engineering and construction practices, including 25-R03: ‘Estimating Lost Labor Schedule Analytics’ and 29R-03: ‘Forensic Schedule Analytics’ from AACEi.
Applying artificial intelligence techniques through the ‘Anetric RNA Engineering’ methodology to estimate compensable deviations from internal and external project impacts.
The ‘Anetric RNA Engineering’ is a methodology based on artificial neural networks that allows predicting future deviations from impacts occurring in the present, and it achieves estimating the deviations that will occur in the construction project for different real or simulated impacts.